Skip to content

improvement(cli): accept the file references, list shapes and multi-file values models send #38206

improvement(cli): accept the file references, list shapes and multi-file values models send

improvement(cli): accept the file references, list shapes and multi-file values models send #38206

Triggered via pull request November 3, 2026 00:43
Status Cancelled
Total duration 4m 11s
Artifacts 19

ci.yml

on: pull_request
version
0s
version
desktop-changes
desktop-changes
trigger-upload
0s
trigger-upload
Matrix: image-amd64
Matrix: image-arm64
Matrix: image-dev
docs-changes
0s
docs-changes
migrate-dev  /  migrate
migrate-dev / migrate
Matrix: checks / integration
Matrix: checks / test
desktop-signing
0s
desktop-signing
Matrix: checks / desktop-live
Matrix: checks / e2e-production
Matrix: checks / e2e
prerelease-create
0s
prerelease-create
prerelease-build  /  build
prerelease-build / build
migrate  /  migrate
migrate / migrate
prerelease-publish
prerelease-publish
promote
promote
prerelease-prune
prerelease-prune
Matrix: ghcr
trigger-promote
0s
trigger-promote
docs  /  embeddings
docs / embeddings
attest-subjects
0s
attest-subjects
indexnow
0s
indexnow
Matrix: attest
release
0s
release
desktop-release  /  build
desktop-release / build
Fit to window
Zoom out
Zoom in

Annotations

45 errors and 179 warnings
checks / integration (migrate, 7/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (push, 7/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 6/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 6/8)
The operation was canceled.
checks / integration (migrate, 3/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 3/8)
The operation was canceled.
checks / integration (push, 6/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (push, 6/8)
The operation was canceled.
checks / build
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / build
The operation was canceled.
checks / integration (push, 8/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 2/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 4/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 4/8)
The operation was canceled.
checks / integration (migrate, 2/8)
The operation was canceled.
checks / test (1/2)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (push, 8/8)
The operation was canceled.
checks / test (1/2)
The operation was canceled.
checks / integration (push, 1/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (push, 1/8)
The operation was canceled.
checks / integration (migrate, 1/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / build (e2e)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 1/8)
The operation was canceled.
checks / integration (push, 2/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / build (e2e)
The operation was canceled.
checks / integration (migrate, 8/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (push, 5/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (push, 2/8)
The operation was canceled.
checks / integration (migrate, 5/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (push, 4/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 8/8)
The operation was canceled.
checks / integration (push, 4/8)
The operation was canceled.
checks / integration (migrate, 5/8)
The operation was canceled.
checks / integration (push, 5/8)
The operation was canceled.
checks / test (2/2)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (push, 3/8)
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / test (2/2)
The operation was canceled.
checks / integration (push, 3/8)
The operation was canceled.
checks / lint
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / lint
The operation was canceled.
checks / lint
Process completed with exit code 1.
checks / ci
Process completed with exit code 1.
checks / ci
Checks did not pass:
ci
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
ci
Canceling since a higher priority waiting request for ci-refs/pull/9589/merge exists
checks / integration (migrate, 6/8)
Skipping sticky disk commit due to previous step failures
checks / integration (migrate, 6/8)
- Step: unknown (canceled)
checks / integration (migrate, 6/8)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (migrate, 6/8)
Skipping sticky disk commit due to previous step failures
checks / integration (migrate, 6/8)
- Step: unknown (canceled)
checks / integration (migrate, 6/8)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (migrate, 3/8)
Skipping sticky disk commit due to previous step failures
checks / integration (migrate, 3/8)
- Step: unknown (canceled)
checks / integration (migrate, 3/8)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (migrate, 3/8)
Skipping sticky disk commit due to previous step failures
checks / integration (migrate, 3/8)
- Step: unknown (canceled)
checks / integration (migrate, 3/8)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (migrate, 3/8)
Unmount failed, retrying (2/10)...
checks / integration (migrate, 3/8)
Unmount failed, retrying (1/10)...
checks / integration (push, 6/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / integration (push, 6/8)
Unmount failed, retrying (9/10)...
checks / integration (push, 6/8)
Unmount failed, retrying (8/10)...
checks / integration (push, 6/8)
Unmount failed, retrying (7/10)...
checks / integration (push, 6/8)
Unmount failed, retrying (6/10)...
checks / integration (push, 6/8)
Unmount failed, retrying (5/10)...
checks / integration (push, 6/8)
Unmount failed, retrying (4/10)...
checks / integration (push, 6/8)
Unmount failed, retrying (3/10)...
checks / integration (push, 6/8)
Unmount failed, retrying (2/10)...
checks / integration (push, 6/8)
Unmount failed, retrying (1/10)...
checks / build
Unmount failed, retrying (7/10)...
checks / build
Unmount failed, retrying (6/10)...
checks / build
Unmount failed, retrying (5/10)...
checks / build
Unmount failed, retrying (4/10)...
checks / build
Unmount failed, retrying (3/10)...
checks / build
Unmount failed, retrying (2/10)...
checks / build
Unmount failed, retrying (1/10)...
checks / build
Skipping sticky disk commit due to previous step failures
checks / build
- Step: unknown (canceled)
checks / build
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (push, 8/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / integration (migrate, 2/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / integration (push, 8/8)
Unmount failed, retrying (9/10)...
checks / integration (migrate, 2/8)
Unmount failed, retrying (9/10)...
checks / integration (push, 8/8)
Unmount failed, retrying (8/10)...
checks / integration (migrate, 2/8)
Unmount failed, retrying (8/10)...
checks / integration (push, 8/8)
Unmount failed, retrying (7/10)...
checks / integration (migrate, 2/8)
Unmount failed, retrying (7/10)...
checks / integration (migrate, 4/8)
Skipping sticky disk commit due to previous step failures
checks / integration (migrate, 2/8)
Unmount failed, retrying (6/10)...
checks / integration (migrate, 4/8)
- Step: unknown (canceled)
checks / integration (migrate, 2/8)
Unmount failed, retrying (5/10)...
checks / integration (migrate, 4/8)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (push, 8/8)
Unmount failed, retrying (6/10)...
checks / integration (migrate, 2/8)
Unmount failed, retrying (4/10)...
checks / integration (migrate, 4/8)
Skipping sticky disk commit due to previous step failures
checks / integration (push, 8/8)
Unmount failed, retrying (5/10)...
checks / integration (migrate, 2/8)
Unmount failed, retrying (3/10)...
checks / integration (migrate, 4/8)
- Step: unknown (canceled)
checks / integration (migrate, 2/8)
Unmount failed, retrying (2/10)...
checks / integration (migrate, 2/8)
Unmount failed, retrying (1/10)...
checks / integration (migrate, 4/8)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (push, 8/8)
Unmount failed, retrying (4/10)...
checks / integration (push, 8/8)
Unmount failed, retrying (3/10)...
checks / integration (push, 8/8)
Unmount failed, retrying (2/10)...
checks / integration (push, 8/8)
Unmount failed, retrying (1/10)...
checks / test (1/2)
Unmount failed, retrying (7/10)...
checks / test (1/2)
Unmount failed, retrying (6/10)...
checks / test (1/2)
Unmount failed, retrying (5/10)...
checks / test (1/2)
Unmount failed, retrying (4/10)...
checks / test (1/2)
Unmount failed, retrying (3/10)...
checks / test (1/2)
Unmount failed, retrying (2/10)...
checks / test (1/2)
Unmount failed, retrying (1/10)...
checks / test (1/2)
Skipping sticky disk commit due to previous step failures
checks / test (1/2)
- Step: unknown (canceled)
checks / test (1/2)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (push, 1/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / integration (push, 1/8)
Unmount failed, retrying (9/10)...
checks / integration (push, 1/8)
Unmount failed, retrying (8/10)...
checks / integration (push, 1/8)
Unmount failed, retrying (7/10)...
checks / integration (push, 1/8)
Unmount failed, retrying (6/10)...
checks / integration (push, 1/8)
Unmount failed, retrying (5/10)...
checks / integration (push, 1/8)
Unmount failed, retrying (4/10)...
checks / integration (push, 1/8)
Unmount failed, retrying (3/10)...
checks / integration (push, 1/8)
Unmount failed, retrying (2/10)...
checks / integration (push, 1/8)
Unmount failed, retrying (1/10)...
checks / integration (migrate, 1/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / integration (migrate, 1/8)
Unmount failed, retrying (9/10)...
checks / integration (migrate, 1/8)
Unmount failed, retrying (8/10)...
checks / integration (migrate, 1/8)
Unmount failed, retrying (7/10)...
checks / integration (migrate, 1/8)
Unmount failed, retrying (6/10)...
checks / integration (migrate, 1/8)
Unmount failed, retrying (5/10)...
checks / integration (migrate, 1/8)
Unmount failed, retrying (4/10)...
checks / integration (migrate, 1/8)
Unmount failed, retrying (3/10)...
checks / integration (migrate, 1/8)
Unmount failed, retrying (2/10)...
checks / integration (migrate, 1/8)
Unmount failed, retrying (1/10)...
checks / build (e2e)
Unmount failed, retrying (7/10)...
checks / build (e2e)
Unmount failed, retrying (6/10)...
checks / build (e2e)
Unmount failed, retrying (5/10)...
checks / build (e2e)
Unmount failed, retrying (4/10)...
checks / build (e2e)
Unmount failed, retrying (3/10)...
checks / build (e2e)
Unmount failed, retrying (2/10)...
checks / build (e2e)
Unmount failed, retrying (1/10)...
checks / integration (push, 2/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / build (e2e)
Skipping sticky disk commit due to previous step failures
checks / build (e2e)
- Step: unknown (canceled)
checks / build (e2e)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (push, 2/8)
Unmount failed, retrying (9/10)...
checks / integration (push, 2/8)
Unmount failed, retrying (8/10)...
checks / integration (push, 2/8)
Unmount failed, retrying (7/10)...
checks / integration (push, 2/8)
Unmount failed, retrying (6/10)...
checks / integration (push, 2/8)
Unmount failed, retrying (5/10)...
checks / integration (push, 2/8)
Unmount failed, retrying (4/10)...
checks / integration (push, 2/8)
Unmount failed, retrying (3/10)...
checks / integration (push, 2/8)
Unmount failed, retrying (2/10)...
checks / integration (migrate, 8/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / integration (push, 2/8)
Unmount failed, retrying (1/10)...
checks / integration (migrate, 8/8)
Unmount failed, retrying (9/10)...
checks / integration (push, 5/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / integration (migrate, 8/8)
Unmount failed, retrying (8/10)...
checks / integration (push, 5/8)
Unmount failed, retrying (9/10)...
checks / integration (migrate, 8/8)
Unmount failed, retrying (7/10)...
checks / integration (push, 5/8)
Unmount failed, retrying (8/10)...
checks / integration (migrate, 8/8)
Unmount failed, retrying (6/10)...
checks / integration (push, 5/8)
Unmount failed, retrying (7/10)...
checks / integration (migrate, 5/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / integration (migrate, 8/8)
Unmount failed, retrying (5/10)...
checks / integration (push, 4/8)
Skipping sticky disk commit due to previous step failures
checks / integration (push, 5/8)
Unmount failed, retrying (6/10)...
checks / integration (migrate, 5/8)
Unmount failed, retrying (9/10)...
checks / integration (migrate, 8/8)
Unmount failed, retrying (4/10)...
checks / integration (migrate, 5/8)
Unmount failed, retrying (8/10)...
checks / integration (migrate, 8/8)
Unmount failed, retrying (3/10)...
checks / integration (migrate, 5/8)
Unmount failed, retrying (7/10)...
checks / integration (push, 5/8)
Unmount failed, retrying (5/10)...
checks / integration (migrate, 5/8)
Unmount failed, retrying (6/10)...
checks / integration (migrate, 8/8)
Unmount failed, retrying (2/10)...
checks / integration (push, 4/8)
- Step: unknown (canceled)
checks / integration (migrate, 5/8)
Unmount failed, retrying (5/10)...
checks / integration (migrate, 8/8)
Unmount failed, retrying (1/10)...
checks / integration (push, 4/8)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (migrate, 5/8)
Unmount failed, retrying (4/10)...
checks / integration (push, 4/8)
Skipping sticky disk commit due to previous step failures
checks / integration (push, 5/8)
Unmount failed, retrying (4/10)...
checks / integration (migrate, 5/8)
Unmount failed, retrying (3/10)...
checks / integration (push, 4/8)
- Step: unknown (canceled)
checks / integration (push, 4/8)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (push, 5/8)
Unmount failed, retrying (3/10)...
checks / integration (migrate, 5/8)
Unmount failed, retrying (2/10)...
checks / integration (push, 5/8)
Unmount failed, retrying (2/10)...
checks / integration (migrate, 5/8)
Unmount failed, retrying (1/10)...
checks / integration (push, 5/8)
Unmount failed, retrying (1/10)...
checks / test (2/2)
Unmount failed, retrying (7/10)...
checks / test (2/2)
Unmount failed, retrying (6/10)...
checks / test (2/2)
Unmount failed, retrying (5/10)...
checks / test (2/2)
Unmount failed, retrying (4/10)...
checks / test (2/2)
Unmount failed, retrying (3/10)...
checks / test (2/2)
Unmount failed, retrying (2/10)...
checks / test (2/2)
Unmount failed, retrying (1/10)...
checks / integration (push, 3/8)
Failed to cleanup and commit sticky disk at /home/runner/_work/sim/sim/node_modules: Error: Command failed: sudo umount -- /home/runner/_work/sim/sim/node_modules umount: /home/runner/_work/sim/sim/node_modules: target is busy.
checks / test (2/2)
Skipping sticky disk commit due to previous step failures
checks / test (2/2)
- Step: unknown (canceled)
checks / integration (push, 3/8)
Unmount failed, retrying (9/10)...
checks / test (2/2)
Found 2 failed/cancelled steps in previous workflow steps
checks / integration (push, 3/8)
Unmount failed, retrying (8/10)...
checks / integration (push, 3/8)
Unmount failed, retrying (7/10)...
checks / integration (push, 3/8)
Unmount failed, retrying (6/10)...
checks / integration (push, 3/8)
Unmount failed, retrying (5/10)...
checks / integration (push, 3/8)
Unmount failed, retrying (4/10)...
checks / integration (push, 3/8)
Unmount failed, retrying (3/10)...
checks / integration (push, 3/8)
Unmount failed, retrying (2/10)...
checks / integration (push, 3/8)
Unmount failed, retrying (1/10)...
checks / lint
Unmount failed, retrying (7/10)...
checks / lint
Unmount failed, retrying (6/10)...
checks / lint
Unmount failed, retrying (5/10)...
checks / lint
Unmount failed, retrying (4/10)...
checks / lint
Unmount failed, retrying (3/10)...
checks / lint
Unmount failed, retrying (2/10)...
checks / lint
Unmount failed, retrying (1/10)...
checks / lint
Skipping sticky disk commit due to previous step failures
checks / lint
- Step: unknown (canceled)
checks / lint
Found 2 failed/cancelled steps in previous workflow steps
checks / lint
Skipping sticky disk commit due to previous step failures
checks / lint
- Step: unknown (canceled)
checks / lint
Found 2 failed/cancelled steps in previous workflow steps

Artifacts

Produced during runtime
Name Size Digest
ci-plan
681 Bytes
sha256:aacc06b5deeb66052b3be8228b43619ceedf0a6aec7c9bcb376666c5f13e1ecb
integration-reports-migrate-1
2.68 KB
sha256:9beb4ef5ffe3d3e2d741ae9c0162ccddcaf928dc50f2e44b1ca09f830f978646
integration-reports-migrate-2
2.68 KB
sha256:3d689338253fde3175c5e3182236216a2a39dc292ea98537754c51f6ef94864e
integration-reports-migrate-3
565 Bytes
sha256:973526d2ce38c8fe6577c31a20b42e291e1269d1bd5d607a726c9efcaa66e51c
integration-reports-migrate-4
1.11 KB
sha256:9a4b70fe66132391606828ef6db0f95114cf0de30ba1ac891035d5ae62abc6be
integration-reports-migrate-5
2.71 KB
sha256:d9d422880ace296e87c14fcb8c7dc0be6e1174b66bac213fb8572d71b9c46132
integration-reports-migrate-6
22.1 KB
sha256:978f73e3074e14b23292983798ebc67d002b4b69ddbe0086fc3c4c588a9c559a
integration-reports-migrate-7
24.6 KB
sha256:80bfce16613856a7adb94a0ecf57004e6c0fca60e255fbaef3a8e2867abca356
integration-reports-migrate-8
1.58 KB
sha256:d3b9106253a82de24ce7a4733a73cf6ebead93455458db72e3464ecabd9eb563
integration-reports-migrate-db
19.7 KB
sha256:d20dbf577a7b1b9012bd96d9e431da6364a021afeb121c2d70c230a4031a6f16
integration-reports-push-1
2.66 KB
sha256:971b7ac7fddf8b1bd66f690bc56bbcb83957f2da3e2c4289e98172ea5608af37
integration-reports-push-2
3.17 KB
sha256:85b5d2b7e16fbbeaaea9bb6ecbc0a415c5e97e9be3e28d7ab9f94f993633f059
integration-reports-push-3
568 Bytes
sha256:0e014e4b406f34c06176cd3b8f0d49dff3484e46f12e697fac02d6f917cdbb25
integration-reports-push-4
1.12 KB
sha256:09dedfaa86323f2b484b26ea9bc3dd5e3c03da12be72e01cc09c78950eefe87d
integration-reports-push-5
2.72 KB
sha256:08bf3d975773992a334fc29d212433357de99616caeea5a8a163f55fbae48d93
integration-reports-push-6
686 Bytes
sha256:b08797c50bb2586f22f5f32109e82f962fe7078b8da129f2a419a6378d200b42
integration-reports-push-7
24.6 KB
sha256:36862cf0c22296a522f8088995d504b715db4366ec23ae6fde330eed28114066
integration-reports-push-8
1.58 KB
sha256:70ebfcd6356fd23cf5677ad396707cad31b2ef8c1f4b1b548179d9ae85e404b9
integration-reports-push-db
21.5 KB
sha256:4d731921ad8bd30ae5855d6bfabb7a6d833c224d52a26ee11ecbc407d37a50cb