Repository navigation
Add heating with terminal cooling mapping to L200 baseline - #37
Open
JieXiong9119 wants to merge 3 commits into
Open
JieXiong9119 wants to merge 3 commits into
JieXiong9119 wants to merge 3 commits into
Conversation
This file contains hidden or bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Sign up for free
to join this conversation on GitHub.
Already have an account?
Sign in to comment
Add this suggestion to a batch that can be applied as a single commit.This suggestion is invalid because no changes were made to the code.Suggestions cannot be applied while the pull request is closed.Suggestions cannot be applied while viewing a subset of changes.Only one suggestion per line can be applied in a batch.Add this suggestion to a batch that can be applied as a single commit.Applying suggestions on deleted lines is not supported.You must change the existing code in this line in order to create a valid suggestion.Outdated suggestions cannot be applied.This suggestion has been applied or marked resolved.Suggestions cannot be applied from pending reviews.Suggestions cannot be applied on multi-line comments.Suggestions cannot be applied while the pull request is queued to merge.Suggestion cannot be applied right now. Please check back later.
Map heating with terminal cooling (NYC Property 2) to an L200 baseline
Summary
BOSS can now build an L200 baseline for buildings where heating and cooling are delivered separately: a heating-only system for heat, plus a cooling-only PTAC for cooling. It also handles a PTAC with a hot-water coil served by a boiler. Mapping uses standard BuildingSync elements only. User-defined (custom) fields are not counted as evidence.
Changes
lib/BOSS/hvac_topology_selector.rbTERMINAL_COOLING_CONFIGURATIONSmaps each heating variant to a configuration name:central_gas_furnacehot_water_baseboardelectric_baseboardBOILER_FUELSmaps the BuildingSyncPrimaryFuelto the measure'sboiler_fuelvalue.hot_water_boiler_fuelandptac_cooling._separate_heating_variantadded._heating_with_terminal_coolingnow handles all three heating variants.DELIVERY_RULESentry "PTAC with hot water coil" (heating_source: hot_water_ptac_coil, plusboiler_fuel).spec/files/v2.7.0/l200_hvac/Example_NYC_Energy_Efficiency_Report_Property_2_l200.xml. It restates the custom fields ofExample_NYC_Energy_Efficiency_Report_Property_2.xmlas standard elements. The original XML is unchanged.spec/tests/unit/heating_with_terminal_cooling_spec.rbcovers the NYC example and the three variants.write_and_run_osws_spec.rbadds the NYC example, expectinghvac_heating_with_terminal_coolingandDOE Ref Pre-1980.BSYNC_MEASURES_REFis pinned to6ee630f71d5da01df79a2c0dab40b1e978c51556(buildingsync-measures-gem, branchadd-hvac_heating_with_terminal_cooling-measure)..vscode/tasks.jsonis reduced to the unit-test task.Testing
-e Property_2_l200): 1 example, 0 failures, about 13 minutes. It ran with the XML at its old path inspec/files/v2.7.0, before the move intol200_hvac/.Dependencies
Requires the buildingsync-measures-gem PR for
hvac_heating_with_terminal_cooling. RepinBSYNC_MEASURES_REFonce that PR is merged.